Water Industry Acronyms and Terms Explained: A Plain-English Glossary for Estates and Facilities Teams

TL;DR: Water industry acronyms fall into five groups: regulators and law such as Ofwat, DWI and the EA, investment and planning such as AMP8, PR24 and WINEP, network and leakage terms such as NRW, DMA and PCC, sewerage terms such as CSO, EDM and FOG, and quality and compliance terms such as MCERTS, NTU and ACoP L8. This glossary defines about 60 of them in plain English, shows how they connect, and links each to a longer guide, so an estates or facilities team can read a water company report or a regulator letter without a translator.

Last updated: 30 October 2026

Key takeaways

  • Water industry acronyms fall into five groups: regulators and law, investment and planning, network and leakage, sewerage and drainage, and quality and compliance.
  • AMP stands for asset management period, and Ofwat’s PR24 price review sets the controls for AMP8, which covers 2025 to 2030.
  • NRW, DMA, MNF and PCC are the core leakage and demand terms: non-revenue water, district metered area, minimum night flow and per capita consumption.
  • CSO, EDM and FOG are the core sewerage terms: combined sewer overflow, event duration monitoring and fats, oils and grease.
  • MCERTS, NTU, ORP and DPD are the core measurement terms for quality and compliance, and ACoP L8 and HSG274 are the core Legionella documents.
  • Many terms have one meaning in water and another elsewhere, for example NRW can mean Natural Resources Wales, so check the context before you assume.
Water industry acronyms in five groups: regulators and law, investment and planning, network and leakage, sewerage and drainage, quality and compliance
Five groups cover most of the jargon you will meet.

A letter arrives from the water company about AMP8 and PCC. A regulator report mentions EDM at every CSO. A supplier talks about NRW and DMAs and MNF. Each term makes sense to the people who use it all day, and to nobody else in the meeting. The result is that estates teams nod, and decisions slow down.

This glossary puts the most useful water industry acronyms in one place, grouped by what they are about, defined in plain English and linked to the longer guide where one exists. It is written for estates, facilities and sustainability teams, councils, housing providers and developers, not for water engineers.

How is this glossary of water industry acronyms organised?

The terms are grouped into five sections. Regulators and law come first, because they explain who sets the rules. Investment and planning explains how money and targets are set. Network and leakage covers the pipes that bring water to you. Sewerage and drainage covers the pipes that take it away. Quality, compliance and technology covers what is measured, why and how.

Within each section the terms are listed in a sensible reading order, not strictly alphabetical, and the most common ones come first. If you are looking for one term, use the search in your browser. The definitions are short on purpose, and each links to a fuller explanation.

Which regulators and laws do you need to know?

  • Ofwat: the Water Services Regulation Authority, the economic regulator for water and sewerage companies in England and Wales. It sets price limits, performance targets and licence conditions.
  • DWI: the Drinking Water Inspectorate, which regulates the quality of public drinking water in England and Wales. See the DWI parameters explained.
  • EA: the Environment Agency, which regulates abstraction, discharges and permits, and manages flood risk from rivers and the sea in England. It issues flood alerts and warnings, as in flood alert vs flood warning.
  • CCW: the Consumer Council for Water, the independent body that represents water customers and publishes guidance, including on leak allowances.
  • Defra: the Department for Environment, Food and Rural Affairs, the government department responsible for water policy in England.
  • LLFA: lead local flood authority, the county or unitary council responsible for local flood risk from surface water, groundwater and ordinary watercourses. See local flood authority monitoring.
  • Water Industry Act 1991: the main statute for the water and sewerage industry. It defines sewers and lateral drains and gives wholesalers the power to serve leakage notices, as explained in who is responsible for a blocked drain and business water leak allowance.
  • Wholesaler and retailer: in the business water market in England, the wholesaler owns the pipes, and the retailer reads the meter and sends the bill. See the leak allowance guide.

Which investment and planning terms matter?

  • AMP: asset management period, a five-year cycle in which water companies plan and fund investment. See what AMP8 is.
  • AMP8: the asset management period covering 2025 to 2030.
  • PR24: the 2024 periodic review, in which Ofwat set price controls and allowances for AMP8. A periodic review is Ofwat’s process for deciding what companies can charge and must deliver.
  • PC and PCL: a performance commitment is a target a company must meet, and the performance commitment level is the specific target value.
  • ODI: outcome delivery incentive, a financial reward or penalty linked to performance against a commitment.
  • PCD: price control deliverable, a specific funded scheme with defined outputs, payment and assurance conditions.
  • WINEP: the Water Industry National Environment Programme, the list of environmental actions water companies must deliver in a period, overseen by the Environment Agency.
  • WRMP: water resources management plan, a company’s long-term plan to balance supply and demand and keep supplies resilient.
  • DWMP: drainage and wastewater management plan, a company’s long-term plan for managing drainage and wastewater, including flood risk.
  • Drought plan, permit and order: the plan sets out how a company would respond to drought, and a drought permit or order allows temporary abstraction or restrictions. See drought permits and orders.

Which network and leakage terms matter?

  • NRW: non-revenue water, water put into supply that is not billed, made up of leakage and unbilled use. See non-revenue water.
  • DMA: district metered area, a section of the network with metered inflow, used to measure leakage and spot bursts.
  • MNF: minimum night flow, the lowest flow into an area or site, usually in the small hours when legitimate use is lowest, which is used to estimate leakage. See night flow analysis.
  • PCC: per capita consumption, the water used per person per day, usually in litres. It is the measure behind targets such as those in Part G water efficiency.
  • ALC: active leakage control, the practice of looking for and fixing leaks proactively, not waiting for them to surface.
  • Customer-side leakage: leakage on a customer’s supply pipe or internal plumbing. See customer-side leakage.
  • Communication pipe and supply pipe: the communication pipe runs from the main to the property boundary and belongs to the wholesaler. The supply pipe runs from the boundary into the property and belongs to the customer. See business water leak allowance.
  • Trunk main: a large-diameter pipe that carries treated water between treatment works, reservoirs and districts.
  • Rising main: a pressurised pipe that carries wastewater or water uphill from a pump. See what a rising main is.
  • PRV: pressure reducing valve, a valve that lowers and holds pressure downstream, used to cut leakage and bursts. See pressure management.
  • Pressure transient: a rapid surge or drop in pressure, often called water hammer. See water hammer monitoring.
  • Water balance: an accounting of water in against water out, used to find losses. See water balance monitoring.
  • Ml/d: megalitres per day. One megalitre is one million litres, or 1,000 cubic metres.
  • Meter accuracy: how closely a meter reads true flow, set by legal error limits. See water meter accuracy.
  • AMR and AMI: automatic meter reading, where a meter sends readings one way, and advanced metering infrastructure, where data and commands can flow both ways. See AMR vs AMI.

Which sewerage and drainage terms matter?

  • Sewer and lateral drain: a sewer is a drain shared by more than one property, and a lateral drain serves one property but lies outside its boundary. See who is responsible for a blocked drain.
  • Combined and separate sewers: a combined sewer carries foul water and surface water together, and separate systems carry them apart. See combined vs separate sewers.
  • CSO and storm overflow: a combined sewer overflow is a relief point that releases diluted sewage to a watercourse when the system is overloaded.
  • EDM: event duration monitoring, the monitoring of when and for how long storm overflows operate. See EDM explained and storm overflow performance.
  • SPS and wet well: a sewage pumping station lifts wastewater, and the wet well is the chamber that collects it. See what a wet well is.
  • WwTW: wastewater treatment works, where sewage is treated before discharge.
  • FOG and fatberg: fats, oils and grease, which bind with wipes and other items into a fatberg that blocks a sewer. See what a fatberg is and the wet wipes ban in England.
  • I&I: infiltration and inflow, groundwater and rainwater entering sewers. See infiltration and inflow.
  • Surcharge: when a sewer or manhole fills above its normal level. See why a manhole surcharges.
  • SuDS: sustainable drainage systems, which manage rainwater near where it falls. See SuDS approval under Schedule 3.
  • Attenuation: storing stormwater temporarily and releasing it slowly. See attenuation tanks.
  • Surface water flooding: flooding caused by rainfall overwhelming drainage. See surface water flooding.
  • Culvert and freeboard: a culvert carries a watercourse under a road or building, and freeboard is the spare height between the water level and the top of a tank or channel. See culverts and freeboard.

Which quality, compliance and measurement terms matter?

  • MCERTS: the Environment Agency’s monitoring certification scheme for equipment and people used to measure discharges and emissions. See what MCERTS is.
  • NTU: nephelometric turbidity unit, the unit for turbidity, the cloudiness of water. See what turbidity is.
  • ORP: oxidation reduction potential, a measure of how strongly water can oxidise or disinfect. See ORP in water.
  • DO: dissolved oxygen, the oxygen available in water for life. See dissolved oxygen.
  • EC and conductivity: a measure of dissolved ions in water. See conductivity in water.
  • BOD and COD: biochemical and chemical oxygen demand, which measure how much oxygen the organic matter in wastewater would use. See COD and BOD.
  • DPD: a colour-change test method for measuring chlorine, and the usual way free chlorine in spa pools and pools is checked.
  • Free, combined and total chlorine: free chlorine is the active disinfectant, combined chlorine has reacted with other matter, and total is the sum. See free vs total chlorine.
  • cfu: colony-forming units, the count of bacteria that grow in a lab test, used for Legionella and other results.
  • Legionella: bacteria that grow in warm, stagnant water and cause Legionnaires’ disease. See what Legionella is.
  • ACoP L8 and HSG274: the approved code of practice and the technical guidance for controlling Legionella in water systems. See what ACoP L8 is and HSG274 Part 2 monitoring.
  • Sentinel outlet: a representative tap or shower used for temperature and sampling checks. See what a sentinel outlet is.
  • TMV: thermostatic mixing valve, which blends hot and cold water to a safe outlet temperature. See TMV temperature monitoring.
  • WRAS: the Water Regulations Advisory Scheme, which approves water fittings and supports compliance with the water fittings regulations.
  • Trade effluent: liquid waste from a business discharged to a sewer under consent. See trade effluent monitoring.
  • Abstraction licence: permission to take water from a river, lake or ground. See abstraction licence monitoring.
  • Private water supply: a supply not provided by a water company, such as a borehole or spring. See private water supplies.
  • Bathing water classification: the grade of a designated bathing site based on testing. See bathing water classification.
  • Hot tub and spa pool rules: see hot tub Legionella and HSG282.

Which technology terms matter?

  • Telemetry: sending measurements from a remote device to a central system, usually by radio, cellular or satellite.
  • SCADA: supervisory control and data acquisition, the system that gathers readings and controls equipment across a site or network.
  • 4-20 mA loop: a standard analogue signal in which the current represents the measurement. See the 4-20 mA loop.
  • WITS: a protocol used by many water companies to move telemetry data. See the WITS protocol.
  • Sonde: a probe, often with several sensors, placed in water to measure quality. See what a sonde is.
  • LoRaWAN and NB-IoT: low-power wireless networks for sensors. See LoRaWAN vs NB-IoT for water.
  • Radar level sensor: a non-contact sensor that measures level with radio waves. See radar vs ultrasonic level sensors.
  • Clamp-on ultrasonic flow meter: a meter fitted to the outside of a pipe that measures flow without cutting it. See the clamp-on ultrasonic flow meter.
  • ATEX: the rules for equipment used in explosive atmospheres. See ATEX Zone 0.
  • Property flood resilience: measures that reduce flood damage to a building. See property flood resilience.
How the leakage terms fit together: water into a district metered area, minimum night flow at night, non-revenue water as the unbilled part, and per capita consumption as use per person
The leakage terms are one chain of ideas.

How do the terms fit together?

The terms connect in chains, and reading them as chains makes them easier to remember. A water company writes a WRMP and a DWMP, which feed into PR24, which sets the AMP8 allowances, which fund WINEP actions and performance commitments, which carry ODIs. A leak shows up as a high MNF in a DMA, which adds to NRW, which the company tries to cut with ALC, PRV and pressure management.

How the planning terms fit together: WRMP and DWMP plans feed PR24, which sets AMP8 allowances that fund WINEP actions and performance commitments with ODIs
Plans feed the price review, and the price review funds delivery.

On the sewerage side, rain or groundwater entering the network adds to I&I, which can push a combined system to a CSO, which is logged by EDM, and the regulator uses that data to judge performance. A wipe and some grease form a fatberg, which blocks a sewer, which backs up a manhole, which surcharges. On a site, the same chains explain why a level sensor in a chamber is useful: it measures the early step in the chain, before it becomes a problem.

How can you use these terms in practice?

Use them to read documents faster and ask better questions. When a water company letter mentions a performance commitment, you know it is a target and an ODI is a reward or penalty. When a supplier quotes NRW reduction, you know to ask which part is leakage and which is unbilled use.

Five questions to ask using water industry terms: what is the minimum night flow, what is the PCC, is this a lateral drain or a sewer, is the equipment MCERTS certified, and what does the risk assessment say under ACoP L8
Five questions the glossary helps you ask.

Five questions that use the glossary:

  1. What is the minimum night flow on this site, and how does it compare with last month?
  2. What is our PCC, and how does it compare with the design figure and the standard?
  3. Is this blockage on a lateral drain or a sewer, and who is responsible?
  4. Does this measurement need to be MCERTS certified, or is a simple sensor enough?
  5. What does our risk assessment say under ACoP L8, and how do we prove the controls are working?

Why do water terms cause confusion?

Many terms are used in more than one way, and the same letters mean different things in different places. NRW is non-revenue water in a network context and Natural Resources Wales in a regulatory one. Class A is a LoRaWAN device class and a temperature probe tolerance. DO can be dissolved oxygen or a digital output. Context decides, so read the sentence around the acronym.

Terms also change. Regulatory documents are revised, programmes are renamed and new rules arrive, so treat a glossary as a guide and check the current document for anything that matters to a decision, such as a legal duty or a deadline.

Frequently asked questions

What does AMP8 mean?

AMP8 is the eighth asset management period, the five-year cycle from 2025 to 2030 in which water companies deliver the investment and performance set in Ofwat’s PR24 price review.

What is the difference between NRW and PCC?

NRW, non-revenue water, is water put into supply that is not billed, so it is mostly leakage. PCC, per capita consumption, is how much water each person uses per day, so it is about demand.

What do CSO and EDM mean?

A CSO is a combined sewer overflow, a relief point that releases diluted sewage when the system is overloaded. EDM is event duration monitoring, which records when and for how long overflows operate.

What is a DMA in water?

A district metered area is a section of the water network with metered inflow, used to measure leakage and detect bursts.

What is MCERTS?

The Environment Agency’s monitoring certification scheme for equipment and people measuring discharges and emissions. Whether you need it depends on the permit or consent you hold.

Where can I find more detail on these terms?

Each entry links to a longer AQUAIOT guide, and the regulators publish their own documents: Ofwat for price reviews, the DWI for drinking water, the Environment Agency for permits and flood risk, and the HSE for Legionella.

Where to start

Pick the five terms that appear most in your own documents and learn those first. If you want help turning them into measurements on your site, contact AQUAIOT with what you manage, and we will suggest what to measure and where.