Local flood authority duties: three sections, one measurement
TL;DR. The Flood and Water Management Act 2010 gives every local flood authority three duties that are all, underneath, evidence problems. Section 9 says develop, maintain, apply and monitor a strategy. Section 19 says investigate a flood and publish the results. Section 21 says keep a register of flood-risk structures recording ownership and state of repair, available for inspection. None of the three can be answered well from an annual visual inspection.
Key takeaways
- Section 9 requires a lead local flood authority to develop, maintain, apply and monitor a strategy for local flood risk management in its area.
- The strategy must specify how and when measures are implemented, their costs and benefits, and how and when the strategy is reviewed.
- Section 19 requires the authority to investigate a flood in its area, publish the results and notify relevant risk management authorities.
- Section 21 requires a register of structures likely to have a significant effect on flood risk, recording ownership and state of repair.
- That register must be available for inspection at all reasonable times.
- State of repair is a continuous property of an asset, not an annual one, which is where monitoring changes the answer.
Table of Contents
On this page
Last updated: 27 August 2026
What does the law actually ask a local flood authority to know?
More than most asset registers can answer. The Flood and Water Management Act 2010 places three separate duties on a lead local flood authority, and read together they describe an organisation that is expected to know the condition of its drainage estate before, during and after an event.

Section 21 is the sharpest of the three local flood authority duties. It requires the authority to establish and maintain a register of structures or features which, in the opinion of the authority, are likely to have a significant effect on a flood risk in its area, together with a record of information about each of them, including information about ownership and state of repair. The register must be available for inspection at all reasonable times.
State of repair is the phrase that does the work. Ownership is a fixed fact that can sit in a spreadsheet for a decade. State of repair is not. A culvert that was clear in March can be two thirds blocked by November, and the register does not know unless somebody went and looked.
What does section 19 require after a flood?
An investigation, and then a publication. On becoming aware of a flood in its area, a local flood authority must, to the extent that it considers it necessary or appropriate, investigate which risk management authorities have relevant functions and whether they have exercised or propose to exercise them. It must then publish the results and notify the relevant authorities.

That is a public document written after the water has gone down, and it is the local flood authority that has to stand behind it. Its quality depends entirely on what was recorded while the water was up. Without level data through the event, a section 19 report is assembled from resident accounts, photographs taken at unknown times and the professional judgement of whoever attended. Those are real evidence, but they cannot say when a chamber surcharged, how fast it rose, or whether a culvert was already restricted before the rain started.
With level data, the same local flood authority report gains a timeline. That matters for the second half of the duty too, because notifying another risk management authority is more useful when it comes with a trace than when it comes with an opinion about whose asset failed first.
Why is section 9 the one people forget?
Because it contains the word monitor and most people read it as write. Section 9 requires a local flood authority to develop, maintain, apply and monitor a strategy for local flood risk management in its area. Four verbs, and only the first is a document exercise.
The strategy has to specify the objectives for managing local flood risk, the measures proposed to achieve them, how and when those measures are expected to be implemented, the costs and benefits of the measures and how they are paid for, the assessment of local flood risk, and how and when the strategy itself is to be reviewed. Every one of those is a claim a local flood authority finds easier to defend with a measurement behind it.
This is where a local flood authority tends to feel the gap most acutely at budget time. Arguing for capital on an asset is straightforward when you can show it now takes three times as long to clear as it did four years ago. It is much harder when the evidence is that someone thinks it looks worse.
Which assets should a local flood authority monitor first?
Start where the register is weakest and the consequence of failure is highest. In practice that is a short list, and it is the same list that generates most section 19 investigations.
- Culverted watercourses, especially at the inlet screen, where a blockage converts a managed channel into a surcharge point.
- Highway gullies and drainage on roads that have flooded before, where the failure is usually silt rather than capacity.
- Attenuation basins and ponds on adopted developments, where storage is lost slowly and invisibly.
- Ordinary watercourses at known pinch points, where a level trace tells you how much freeboard you actually have.
- Pumping stations and their wet wells, where the asset is critical and the failure is binary.

All five fail by degrees rather than all at once, and all five are measured today by a local flood authority officer visiting. That is the specific thing continuous monitoring changes, and it is worth being precise about the claim: it does not stop a culvert blocking. It tells you the culvert is blocking while there is still time to clear it.
What does the monitoring stack look like?
Level first, because it is the one measurement that serves all three local flood authority duties at once. AQUAIOT Radar is 60 GHz non-contact level sensing accurate to within ±2 mm, reading through foam, vapour and condensation, with ATEX variants for hazardous chambers. Nothing sits in the water, which matters on assets whose whole failure mode is debris and silt.
For the wider drainage network, AQUAIOT’s sewer monitoring service applies the same radar sensing across wet wells, rising mains, manholes and overflows. Where a council is also managing rainwater at source, the AQUAIOT Smart Water Butt uses rainfall-aware logic to free storage before a storm rather than sitting full when one arrives.

Everything reports over encrypted cellular and LoRaWAN into the AQUAIOT Cloud, with threshold alarms, trendlines, role-based access and exports, plus RS485 and Modbus on site and open APIs into a council’s own GIS, asset management or CAFM system. That last point matters more for a local flood authority than for most other buyers, because the section 21 register has to be available for inspection, which means the data needs to end up somewhere the public-facing system can reach.
Frequently asked questions
What is a lead local flood authority?
It is the unitary authority or county council responsible for managing local flood risk under the Flood and Water Management Act 2010. Local flood risk means flooding from surface runoff, ordinary watercourses and groundwater, as distinct from main rivers and the sea, which sit with the Environment Agency.
Does a local flood authority have to publish a section 19 report for every flood?
Not every flood. The duty applies to the extent that the authority considers it necessary or appropriate to investigate, which leaves the trigger to the authority’s judgement. Where it does investigate, section 19 requires it to publish the results and notify the relevant risk management authorities.
What has to go in the section 21 register?
Structures or features which, in the authority’s opinion, are likely to have a significant effect on flood risk in its area, plus a record of information about each one including ownership and state of repair. The register must be available for inspection at all reasonable times, and ministers may make regulations about what is included or excluded.
Can sensor data go into a flood asset register?
There is no requirement to hold live data in the register itself, and it would be an odd place for it. The practical pattern is to keep the register as the record and let monitoring inform the state of repair entry, so that field is based on a recent measurement rather than the date of the last visual inspection. Open APIs are what make that workable.

The practical version
No local flood authority is going to instrument every structure on its register, and nothing in the Act asks it to. The useful move is narrower: identify the handful of assets that have generated section 19 investigations before, instrument those, and let the state of repair field in the register be a measurement rather than a memory.
Done that way, one deployment serves a local flood authority’s strategy, its investigations and its register at the same time. Speak to an AQUAIOT engineer about levelling the culverts and chambers that keep appearing in your flood reports.
By GP, Digital and IoT lead at AQUAIOT.