Leak detection and automatic shut-off, installed and supported in the UK
Automatic water shut-off
Close the water supply as soon as a leak sensor gets wet, even when nobody is on site.
A leak alert on its own still needs someone to come and turn the water off. Here a leak sensor, a controller and a shut-off valve work as one system: when water reaches the sensor, the controller closes the valve on the supply and the alert goes to your team at the same moment.
On siteThe controller closes the valve, even offline
LoRaWAN or 4GHow the alert travels
Why shut off automatically
A leak alarm still needs someone to turn the water off.
A sensor that sends an alert is a good start. But at two in the morning, in a plant room nobody visits, the water keeps running until a person arrives and finds the right valve. Closing the supply automatically takes that wait out of the incident.
Out of hours
An alarm at night waits for a call-out. The controller closes the valve itself, on site, without waiting for anyone.
Hidden spaces
Plant rooms, pump houses and process areas are where water runs longest, because nobody sees it start.
Line pressure
A failed joint on a pressurised line keeps feeding water until the supply to that branch is closed.
A clear record
The dashboard keeps the time the sensor got wet, the time the valve closed and who was told.
The shut-off sequence
This is what happens when a leak sensor gets wet.
The rule that closes the valve runs inside the controller on site, so the first three steps do not need the network. Only the alert in step four travels over LoRaWAN or 4G.
DIAGRAM
01
Water reaches the sensor.
A joint gives way, water runs to the low point of the floor and the leak sensor there gets wet.
02
The controller switches its relay.
The sensor is wired to an input on the controller. Its own rule switches the relay on site, without waiting for the network.
03
The valve closes the supply.
The relay cuts the power to the valve coil. The valve is normally closed, so it shuts and the flow stops.
04
Your team is told.
The controller reports over LoRaWAN or 4G, and the AQUAIOT dashboard sends the alert by email or SMS to the people you choose.
A simplified sequence. Diagram, not to scale.
Sensors, controller and valve as one system, reporting through a LoRaWAN gateway or over 4G. Diagram, not to scale.
How it works
The sensor, the controller and the valve work as one system.
The leak sensors are wired to the inputs of a controller on the wall, and the controller’s relay is wired to the coil of the shut-off valve. Its own rule closes the valve on site, so the shut-off still works if the network drops, and the event is reported over LoRaWAN or 4G as soon as it can be.
We survey the supply.
We look at the pipe size, the pressure, the branch that feeds the area and where water would go first.
Sensors go where water collects.
Wired leak sensors sit at the low points of the floor, under plant and beside the joints most likely to fail. Wireless AQUAIOT leak sensors can watch the rest of the building as usual.
The valve goes on the supply.
A shut-off valve is fitted on the branch that feeds the area, and wired to the controller’s relay.
You choose the rules.
Close on any wet sensor or only when two agree, tell the right people, and decide who may reset the supply.
Choosing the rules
Every site decides how cautious the system should be.
The same hardware can close at the first drop or wait for a second sensor. We set it up with you so the valve closes when it should and stays open when water is part of the job.
When to close
One sensor or two.
Plant rooms usually close on the first wet sensor.
Where splashes are normal, two sensors must agree before the valve closes.
After a power cut
Normally closed or normally open.
The standard valve closes when power is lost, so a power cut also closes the supply.
A normally open valve, made to order, keeps the supply on through a power cut and closes only on command.
Opening again
A person resets it.
The supply stays closed until someone has looked at the leak and reset it on site.
An authorised person can also reset it from the dashboard once the leak has been checked.
Your ruleThe valve closes on the first wet sensor, also closes in a power cut, and opens again only after a reset on site.
Where it fits
It suits the supplies that feed rooms nobody watches.
The shut-off valve covers threaded pipe from 3/8 inch to 2 inch, which takes in most process water branches to plant, process equipment, wash-down points and irrigation.
Plant rooms
Process water feeds to softeners, chillers, process tanks and pumps, on a branch that can be closed without affecting the rest of the building.
Process water lines
Supplies to washers, rinsers and production equipment, closed the moment water escapes.
Cooling circuits
Make-up water to chillers and process coolers, where a split hose can empty a circuit across the floor.
Wash-down lines
Hose points and cleaning stations that are easy to leave running at the end of a shift.
Irrigation lines
Irrigation supplies where a burst can run unnoticed for days.
Unmanned sites
Process, wash-down or irrigation supplies at unmanned sites such as pump houses and depots, where the next visit could be days away.
The system is for process water, not for drinking water.
Fittings on a drinking-water supply have to meet the Water Supply (Water Fittings) Regulations 1999, and we do not offer a WRAS-listed valve with this system. It is for process water, cooling water, wash-down and irrigation lines.
Why AQUAIOT
We plan, install and support the whole system.
The sensors, the controller and the valve come from specialist manufacturing partners. AQUAIOT chooses them for your supply, installs them, connects them and stays with you after go-live.
Site survey
We check the pipework, the pressure and the branch that should close.
Installation
Sensors placed, the valve fitted on the supply and the controller wired and tested.
Alarms and rules
We agree when the valve closes, who hears about it and who may reset it.
Training and support
Your team learns the dashboard, and we support the system for as long as it runs.
Two versions of the shut-off valve: one with a lead-wire coil and one with a DIN connector.
These are the questions facilities teams ask first.
What happens to the valve if the power fails?
The standard valve is normally closed, so it also closes if the power is lost. For a supply that must stay on during a power cut, a normally open valve can be made to order instead, which closes only when the controller tells it to.
Does the valve open again by itself?
No. Once a leak has closed the supply it stays closed until someone resets it. We agree with you whether that reset happens on site only or also from the dashboard.
Which pipe sizes does the valve suit?
The shut-off valve comes in seven sizes from 3/8 inch to 2 inch threaded connections, with a brass body, for water at up to 5 bar.
Can it be fitted to a drinking-water supply?
No. Fittings on a drinking-water supply have to meet the Water Supply (Water Fittings) Regulations 1999, and we do not offer a WRAS-listed valve with this system. It is for process water, cooling water, wash-down and irrigation lines.
Does it need the internet to close the valve?
No. The leak sensors are wired to the controller, and its own rule closes the valve on site, so the shut-off still works if the network drops. The alert is sent as soon as the controller can report.
Will a single splash close the supply?
The leak sensor reacts to water touching it, so we place sensors where a real leak collects rather than where water is used. Where splashes are likely, the rule can require two sensors to agree before the valve closes.
How does the alert reach our team?
The controller reports over LoRaWAN or 4G to the AQUAIOT dashboard, which sends the alert by email or SMS to the people you choose, at the same time as the valve closes.
Speak to an expert
Tell us which supply you want to protect and we will plan the shut-off.
An AQUAIOT engineer will look at the pipe size, the pressure, the area the branch feeds and who needs to hear when it closes.
Site surveyWe check the supply and the branch before anything is ordered.
Installation and testingSensors, valve and controller fitted and tested on site.
One monitoring partnerShut-off alongside leak detection, flow metering and water quality.